FI-MainGroup/Facet-Choice

  • E02D,ESW
  • Applicable area: "1/00-37/00" Support systems of construction works, e.g. designing, execution, management [other than control]
  • E02D,ETD
  • Applicable area: "1/00-37/00" Characterized by installing solar cells to civil engineering structures, buildings or ground
  • E02D1/00
  • Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) HB CC 2D043
  • E02D3/00
  • Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/10; setting rock anchoring bolts E21D) HB CC 2D043
  • E02D5/00
  • Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16) HB CC 2D049
  • E02D7/00
  • Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00) HB CC 2D050
  • E02D9/00
  • Removing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00) HB CC 2D050
  • E02D11/00
  • Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D 7/00, to removing only E02D 9/00) HB CC 2D050
  • E02D13/00
  • Accessories for placing or removing piles or bulkheads HB CC 2D050
  • E02D15/00
  • Handling building or like materials for hydraulic engineering or foundations (conveying or working-up concrete or similar masses in general E04G 21/02) HB CC 2D045
  • E02D17/00
  • Excavations; Bordering of excavations; Making embankments (soil shifting apparatus E02F; earth drilling E21) HB CC 2D044
  • E02D19/00
  • Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D 5/02) HB CC 2D042
  • E02D23/00
  • Caissons; Construction or placing of caissons (tunnels submerged into or built in open water E02D 29/063) [6] HB CC 2D042
  • E02D25/00
  • Joining caissons or like sunk units to each other under water HB CC 2D042
  • E02D27/00
  • Foundations as substructures HB CC 2D046
  • E02D29/00
  • Underground or underwater structures (underground tanks B65D88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H6/00; underground air-raid shelters E04H9/12; burial vaults E04H13/00); Retaining walls [6] HB CC 2D147
  • E02D31/00
  • Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution (spillage retaining means for tanks B65D 90/24) HB CC 2D147
  • E02D33/00
  • Testing foundations or foundation structures (testing methods or apparatus, see the relevant subclasses of class G01; testing structures or apparatus as regards function, in general, G01M; investigating or analysing materials by determining their chemical or physical properties, in general G01N) HB CC 2D147
  • E02D35/00
  • Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations HB CC 2D147
  • E02D37/00
  • Repair of damaged foundations or foundation structures HB CC 2D147
    TOP