This page displays all 「FI」 in main group E02D7/00. |
HB:Handbook | ||||
CC:Concordance |
|
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00) | HB | CC | 2D050 | |
|
Methods or devices for simultaneously placing sheet pile bulkheads, piles, moulds while digging | HB | CC | 2D050 | |
|
Others | HB | CC | 2D050 | |
|
.Placing by driving | HB | CC | 2D050 | |
|
..Hand pile-drivers | HB | CC | 2D050 | |
|
..Power-driven drivers | HB | CC | 2D050 | |
|
...Drop drivers with free-falling hammer | HB | CC | 2D050 | |
|
...with pressure-operated hammer | HB | CC | 2D050 | |
|
...Drivers with explosion chambers | HB | CC | 2D050 | |
|
...Components for drivers | HB | CC | 2D050 | |
|
....Scaffolds for drivers | HB | CC | 2D050 | |
|
.Placing by vibrating | HB | CC | 2D050 | |
|
.Placing by pressure or pulling power | HB | CC | 2D050 | |
|
.Placing by screwing down | HB | CC | 2D050 | |
|
.Placing by using fluid jets | HB | CC | 2D050 | |
|
.Placing by using several means simultaneously | HB | CC | 2D050 | |
|
.Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes | HB | CC | 2D050 | |
|
..by driving cores | HB | CC | 2D050 | |