F-Term-List

2D043 Investigation of foundation soil and reinforcement of foundation soil by compacting or drainage
E02D1/00 -3/115
E02D1/00-1/08 AA AA00
PURPOSE OF INVESTIGATION
AA01 AA02 AA03 AA05 AA06 AA07 AA08 AA09
. Investigation of the load-bearing ability of soil . . Detection of horizontal displacement . . Detection of vertical displacement . Investigation for water permeability . Investigation for air permeability . Investigation of underground water pressure and of the water table . Investigation of water loss . Investigation of resistance to earthquakes and resistance to liquefaction
AB AB00
METHODS OF INVESTIGATION
AB01 AB02 AB03 AB04 AB06 AB07 AB08 AB09
. Investigation of foundation soil by penetration . . Investigation of foundation soil after penetration by means of shock force . . Penetration by means of loading force or driving force . . Investigation after the application of rolling force . Investigation of foundation soil by use of ultrasonic waves or electromagnetic waves . Investigation of foundation soil by use of vibration . Investigation of foundation soil by use of shock waves . Investigation of foundation soil by extraction
AC AC00
TIME OF INVESTIGATION
AC01 AC03 AC05
. Investigation of foundation soil before the start of construction work . Investigation of foundation soil after construction work . Investigation of foundation soil during construction work
BA BA00
INVESTIGATION APPARATUSES
BA01 BA03 BA05 BA07 BA08 BA09 BA10
. Cone-equipped apparatuses for investigating foundation soil . Vane-equipped apparatuses for investigating foundation soil . Apparatuses for investigation of foundation soil that operate by forming a hole . Apparatuses with samplers for investigating foundation soil . . Apparatuses with soil samplers for investigating foundation soil . . Apparatuses with water samplers for investigating foundation soil . Others
BB BB00
COMPONENTS OF INVESTIGATION APPARATUSES AND RELATED DEVICES
BB01 BB02 BB03 BB04 BB05 BB07 BB08 BB09
. Devices relating to rods . . Devices relating to rod insertion . Devices relating to handling . Devices relating to recording . Devices relating to the cone . Devices relating to rod extraction . Devices relating to the vane . Devices relating to the sampler
BC BC00
INSERTION, EXTRACTION, AND ROTATION DRIVING MEANS FOR INVESTIGATION APPARATUSES
BC01 BC03 BC04 BC05 BC07
. Electrically powered driving means . Driving means using fluid pressure . . Driving means using pneumatic pressure . . Driving means using hydraulic power . Driving means using manual power
E02D3/00-3/115 CA CA00
METHODS OF TAMPING, COMPACTING, DISPLACING, AND FREEZING
CA01 CA02 CA03 CA04 CA05 CA06 CA07 CA08 CA09 CA10
. Displacement of the foundation soil . . Displacement of the portion of the foundation soil in sand holes . Drainage or tamping of the foundation soil by applying pressure . . Tamping of the foundation soil while draining . . Tamping of the foundation soil with pressurized injection of liquid . Tamping of sand holes in the foundation soil followed by tamping of the foundation soil itself . Imparting of load-bearing strength to the foundation soil before the foundation soil is compacted . . Application of sand to the foundation soil and tamping . . Compacting of the foundation soil by applying pneumatic pressure . . Placement of a heavy load on the foundation soil before compacting
CA11 CA12 CA13 CA14 CA15 CA16 CA17 CA20
. Insertion of a bag into the foundation soil and expansion of the bag . Insertion of rigid elements such as steel pipes into the foundation soil . Application of electricity to the foundation soil . Freezing of the foundation soil . Tamping of the foundation soil by roller pressure applied to filler materials . Use of explosive force . Compacting of the foundation soil by droppin heavy weights . Others
CB CB00
DEVICES AND RELATED COMPONENTS FOR TAMPING, COMPACTING, DISPLACING, AND FREEZING
CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08
. Rollers . . Sheepsfoot rollers . Vibration devices . . Tampers or rammers . . . Roller pressure sheets . Heavy weights . . Grippers or means for removing heavy weights . Suction or pressure pumps
DA DA00
METHODS FOR REMOVING WATER FROM FOUNDATION SOIL
DA01 DA02 DA03 DA04 DA05 DA06 DA07 DA09 DA10
. Use of well point methods . Use of osmotic pressure . Use of sheet-like materials . Use of column-like, trough-like or tubular draining elements . . Use of sand holes . . Use of lime holes . . Use of gravel . Use of paper or rope . Others
DB DB00
DEVICES FOR FORMING WATER REMOVAL PILES
DB01 DB02 DB03 DB04 DB05 DB06 DB07 DB08 DB09 DB10
. Casings . . Casings that are rolled . . Casings that are twisted, pushed, or extracted . . Devices using a double-tube casing . . Devices using a casing with a screw . . Devices using a casing that is not round . . Detailed structure of the casing . . . Casings with liquid injection means . . . Casings with means for accelerating the inflow of filler materials . . . Casings with impeller vanes for compaction
DB12 DB13 DB14 DB15 DB16 DB17 DB18 DB19 DB20
. . Casing control . . . Pile driving . . . Hydraulic pressure control . . . Electric control . Devices for forming water-removal piles with measuring devices . . Measurement of the volume of inserted sand . . Measurement of the position of the pile surface . . Measurement of the strength of the water-removing pile . . Indicators or recording devices
DB21 DB22 DB23 DB24 DB25 DB26 DB27 DB28 DB29
. Water-removal piles with no casing . Vibration mechanisms . . Vibration mechanisms installed at lower end of the casing . . Multiple vibration mechanisms arranged vertically . Screws . Extrusion elements . Devices for supplying filling materials . . Bucket-like devices . . Hopper-like devices
DC DC00
PAPER- AND ROPE-DRAIN-FORMING DEVICES
DC01 DC02 DC03 DC04 DC05 DC06 DC07 DC08 DC09
. Anchor members . Mandrels . . Mandrel shoes . . Penetration bodies that are not hollow . Means for insertion and retention of the drain material . Protection for the bottom edge of the drain material . Cutting devices for drain materials . Means for protection against simultaneous lifting . Guide casings
DC11 DC13 DC14 DC15 DC17 DC18 DC19
. Devices for supplying drain materials . Devices for control of drain formation . . Measurement of depth to which the drain is to be inserted . . Indication and recording of the status of drain insertion . Devices using vibration . Devices that inject fluids . Devices relating to the vehicle, boom, or arm
DD DD00
MATERIALS FOR WATER REMOVAL
DD01 DD02 DD03 DD04 DD05 DD06 DD07 DD08 DD09 DD10
. Sheet-like materials . . Sheet-like materials with uneven surfaces . . Sheet-like materials with uneven cores . . Sheet-like materials in lattice form . . Sheet-like materials that are not flat . . Sheets with reinforcement . . Sheets with drain pipes . . Sheets with spacing materials . . Sheets consisting of nonwoven materials . . Sheets containing thermal plastic resins
DD11 DD12 DD13 DD15 DD16 DD18 DD20
. . Sheets containing asphalt . . Sheets with needle-punch performations . . Sheets with thermal bonding . Pipes for water removal . . Strainers . Sand . Others
DE DE00
BAGS FOR PACKING OF PILES
DE01 DE02 DE03 DE04 DE05
. Pulverized materials . Expanding or elastic materials . Water-soluble materials . Bags containing means for preventing clogging . Bags containing reinforcements
EA EA00
FILLING MATERIALS CONSISTING OF COMPACTED OR DEHYDRATED BODIES
EA01 EA02 EA03 EA04 EA05 EA06 EA07 EA08 EA09 EA10
. Sand . Ballast or crushed stone . Bundles of textiles . Lime . Slag . Filling materials containing cement . Synthetic-resin foamed bodies . Bag-shaped materials . Rope-shaped materials . Others
E02D1/00-3/115 EB EB00
DEHYDRATION, COMPACTING, INVESTIGATION, AND RAMMING FOR SPECIFIC FOUNDATION SOILS
EB01 EB02 EB03 EB04 EB05 EB06
. Bedrock . Sandy layers . Gravel layers . Viscous layers . Underwater foundation soils . Others
TOP