F-Term-List

(Not Translated)
2D147 UNDERGROUND STRUCTURES, PROTECTING, TESTING AND RESTORING FOUNDATIONS
E02D29/00 ;29/045-37/00
E02D29/00;29/045-29/05@Z AA AA00
UNDERGROUND STRUCTURES
AA01 AA02 AA03 AA05 AA06 AA07 AA08 AA09 AA10
. Underground spaces . . Waterproofing . . Heat insulation . . Sectional units . . . Partitions . . . . Panels . . Secondary facilities . . . Ventilation systems . . . Drainage systems
AB AB00
CONSTRUCTION OF LARGE UNDERGROUND SPACES
AB01 AB02 AB04 AB06 AB08
. Use for specific purposes . . Use for underground tanks . Use of construction methods involving inverted striking . Use of caissons . Construction of underground spaces with continuous walls
AC AC00
CONDUITS
AC01 AC02 AC04 AC05 AC06 AC07 AC08 AC10
. Tunnels or underground trenches for installing conduits . . Common trenches . Manufacture of conduits in situ . . Manufacture of conduits in situ . . . Manufacture by compacting concrete . . . Manufacturing by consolidating muddy water . . Framing . Repair and correction of conduits
E02D29/12-29/12@Z BA BA00
MANHOLES
BA01 BA02 BA03 BA04 BA05 BA07 BA08 BA09
. Foot-ladder apparatuses . . Apparatuses that mount on the cover frame . . Apparatuses that mount on the side elements . . . I-shaped ladders with a single central support for the rungs . . . E-shaped ladders with the rungs on one side of a single support . Construction equipment . . Safety fences . . Protective net
BA11 BA17 BA18 BA19 BA20
. Implements for opening and closing manholes . Adjustment of the height of the manhole cover frame . . Use of an adjustment ring . . Use of spacers . . Use of nuts and bolts
BA21 BA22 BA23 BA27 BA28 BA29
. Connection of corresponding side elements to one another . . Use of connecting plates . . Use of box elements and bolts . Connection to conduits . . Conduits with secondary channels . . Use of inverted arches (e.g., for aqueducts)
E02D29/14-29/14@Z BB BB00
MANHOLE COVERS AND FRAMES FOR COVERS
BB01 BB02 BB03 BB06 BB07 BB08
. Locking elements . . Locking by rotation of the fastening end . . Locking by sliding of the fastening end . Opening and closing elements . . Hinges . . Grips
BB11 BB12 BB13 BB16 BB17
. Flexible support for the covers by use of packing . . Packing mounted at the side of the cover . . Packing mounted underneath the cover . Shape of the cover sides . . Slanting shapes
BB21 BB22 BB23 BB24 BB26
. Structure of the cover itself . . Laminated covers . . Non-slip covers . . Double covers (i.e., covers containing an inner cover) . Cover frames
E02D29/045-29/09 CA CA00
OBJECTS TO BE LINED OR SUPPORTED
CA01 CA02 CA03 CA04 CA05 CA06 CA07 CA08 CA09 CA10
. Underground railways . Road tunnels . Mines . Culverts and sewage systems . Interconnected ditches . Tunnels for storage of electric cables and the like . Above-ground tunnels . Tunnels built over water or underwater . . Tunnels built on water-beds . Tunnels built deep underground
DA DA00
TUNNEL CONSTRUCTION METHODS
DA01 DA02 DA03 DA04 DA05 DA06 DA07 DA09
. Shield-construction methods . . Enlarged shield-construction methods . Shield-driving methods . Projectile boring . Methods for constructing mountain tunnels . . New Austrian Tunneling Method [NATM] . Open-trench construction methods . Methods combined with injection of foundation soil
DB DB00
TUNNEL CROSS-SECTIONAL SHAPES
DB01 DB02 DB03 DB04 DB05 DB06 DB07 DB08 DB09 DB10
. Circular tunnels . Circular tunnels . Rectangular tunnels . Specific cross-sectional shapes . . Oval types . . Cigar-shaped types . . Horizontal types . . Vertical types . Curved tunnels . Junctions
EA EA00
TUNNEL LININGS
EA01 EA02 EA03 EA04 EA06 EA07 EA08 EA10
. Primary-stage linings . Intermediate lining members . Second-stage linings . . Interior design (finishing) . Roof construction (Arch) . Side-foundation construction (sidewall) . Bottom construction (inverted construction) . Construction of partitions
FA FA00
CONCRETE LININGS CAST ON-SITE
FA01 FA02 FA03 FA04 FA05 FA06 FA07 FA08 FA09 FA10
. Shuttering . . Outer shuttering . . Paneled shuttering . . . Press rings . . Saddle supports . . Bag-type apparatuses . . Expandable mold plates . . Movable mold forms . . Chaplet machines . Bar arrangements
FA11
. Driving of the lining before tunnel excavation
FB FB00
SPRAYING
FB01 FB02 FB03 FB04 FB05 FB06 FB07 FB09
. Spraying machines . . Nozzle types . . . Materials mixed in the vicinity of the nozzle . . Rotating types . . Control . . . Control of the position of the spraying machine . . Trowels . Nets
GA GA00
SUNKEN CAISSONS
GA01 GA02 GA03 GA05 GA06 GA07
. Connected types . Free-standing types . Assembled types . Caissons with characteristic methods of installation . . Foundations for installing sunken caissons . . . Filling-in of the foundation
GB GB00
SEGMENT STRUCTURE
GB01 GB02 GB03 GB04 GB05 GB06 GB07 GB08 GB10
. Segment shapes . . Key segments . . Support members . . Joint floor blocks . Pouring of concrete and the like, into members . . Bag types . Expandable segments . Flexible segments . Segment formation
HA HA00
PROPS, HINGED BARS, AND LOCK BOLTS
HA01 HA02 HA03 HA04 HA05 HA06 HA07 HA08 HA10
. Props . . Friction props . . Props for the hydrostatic pressure system . . . Buried pumps . . Expandable through step-by-step movement . Hinged bars . Sliding hinged bars . . . Hinged bars connected to other hinged bars or connected to props . Lock bolts
HB HB00
ARCHES AND SELF-PROPELLED SUPPORTS
HB01 HB02 HB03 HB04 HB05 HB06 HB07 HB08 HB09 HB10
. Arches . . Assembled expandable arches . . Sliding arches . . Fixtures between the arch and the earth roof . Self-propelled supports . . Use of wall-mining methods . . Advancing mechanisms . . Control of self-propelled supports . . . Remote control of self-propelled supports . . . Control of multiple self-propelled supports
JA JA00
HANDLING OF SHUTTERING, SUPPORTS, AND LINING MATERIALS
JA01 JA02 JA03 JA04 JA05 JA06 JA07 JA08
. Transport methods . Transport apparatuses . . Receiving apparatuses . . Transfer apparatuses . . . Transfer in the vertical direction . . . Transfer in the vertical direction . . . Lifting and hoisting . . Delivery apparatuses
JB JB00
ASSEMBLY OF SHUTTERING, SUPPORT, AND LINING (SEGMENTS)
JB01 JB02 JB03 JB04 JB05 JB06 JB07 JB08 JB09 JB10
. Assembly methods and sequences . Erection devices . . Rotating systems . . . Erection devices having a rotating ring . . . . Erector hoses . . . Control of rotation . . Retention apparatuses . . Positioning control . . Bolt-fastening machines . Erection devices connecting metal connectors
JB11 JB12 JB13
. Scaffolding . Methods for fixing segments directly to the soil . Dismantling of shuttering, supports, and linings
JC JC00
JOINING OF PRECAST MEMBERS
JC01 JC02 JC03 JC04 JC05 JC06 JC07 JC08 JC09 JC10
. Indentations and projections provided in precast members . Joining members . . Simultaneously joining three or more pre-cast members . . Mounting structures for joining members . . . Members into which bolts can be inserted . . Bolts . . . Curved bolts . Joint stoppers . Sealing materials . . Injection holes for sealing materials
JD JD00
JOINTS OF PRECAST MEMBERS
JD01 JD02 JD03 JD04 JD05
. Flexible joints . . Flexible joints having a bellows . . Means for ensuring durability . Multi-layered structures . Structures for mounting joint members
KA KA00
WATERPROOF SHEETS
KA01 KA02 KA03 KA04 KA05 KA06 KA07 KA08
. Sheet structure . Sheet members . Spreading devices . . Anchoring . . Devices for installing on arches . Spreading machine . Joining of sheets . . Heat welding
LA LA00
BACKFILLING
LA01 LA02 LA03 LA04 LA05 LA06 LA07
. Injection holes . Injection tubes . . Injection-tube washing . Injection bags . Control of backfilling . Tail rings . Tail boards without bearing pressure
MA MA00
CONCRETE AND MORTAR AS LINING AND SUPPORT MATERIALS
MA01 MA02 MA03 MA04 MA05 MA06 MA07 MA08 MA09 MA10
. High-strength concrete . Textile-reinforced concrete . Resin-injected concrete . Quick-setting concrete . . Super quick-setting concrete . Expanding concrete . Foamed mortar and concrete . Additives . . Air-entraining agents (AE) . . High-liquidity agents
MA11
. . Delaying agents
MB MB00
LINING AND SUPPORT MATERIALS 2
MB01 MB02 MB03 MB04 MB05 MB06 MB07 MB08 MB09 MB10
. Water glass . Aggregates . Metal materials . . Steel materials . . Steel reinforcements . . Metal mesh . Composite materials . . Steel-reinforced concrete . Rubber . Macromolecular compounds
MB11 MB12 MB13 MB14 MB15 MB16 MB17
. . Synthetic resins . . Foamed resins . . . Fiber-reinforced plastic (FRP) . Expandable materials . Woven cloth materials . Nonwoven cloth materials . Wood
MC MC00
DRIVING OF LINING MATERIALS
MC01 MC02 MC03 MC04 MC05 MC06
. Driving apparatuses . . Apparatuses for supplying material . . . Supply pipes . . . . Connection tools . Mixing apparatuses . Methods
NA NA00
PURPOSE OF IMPROVEMENTS
NA01 NA02 NA03 NA04 NA05 NA06 NA07 NA08 NA09 NA10
. Measures to protect against underground water . . Leakproofing . Water drainage . Prevention of freezing . Curing . Prevention of cracking . Anti-vibration measures . Noise-proofing . . Noise insulation . Prevention of splashing when spraying
NA11 NA12 NA13 NA14 NA15 NA16 NA17 NA18 NA19
. Maintenance of rounded shape of the segments and the like . Automation . Measurement . Improvement of filling (backfilling and in situ casting) . . Confirmation of filled status (backfilling and on-site casting) . Repair . Ensuring of safety . Compensation for uneven settlement . . Earthquake-proofing
TOP