FI (list display)

  • E02D3/00
  • Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/10; setting rock anchoring bolts E21D) HB CC 2D043
  • E02D3/00,101
  • .by replacing soil HB CC 2D043
  • E02D3/00,102
  • .by installing sheets HB CC 2D043
  • E02D3/02
  • .Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) [3] HB CC 2D043
  • E02D3/02,101
  • ..by loading HB CC 2D043
  • E02D3/02,103
  • ..by pressurising HB CC 2D043
  • E02D3/026
  • ..by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) [3] HB CC 2D043
  • E02D3/032
  • ...Trench rollers [3] HB CC 2D043
  • E02D3/039
  • ...Slope rollers [3] HB CC 2D043
  • E02D3/046
  • ..by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/30, for consolidating concrete in general E04G 21/06) [3] HB CC 2D043
  • E02D3/054
  • ...involving penetration of the soil, e.g. vibroflotation [3] HB CC 2D043
  • E02D3/061
  • ...Tampers with directly acting explosion chambers (pile drivers with explosion chambers E02D 7/12) [3] HB CC 2D043
  • E02D3/068
  • ...Vibrating apparatus operating with systems involving reciprocating masses (E02D 3/054, E02D 3/061 take precedence) [3] HB CC 2D043
  • E02D3/074
  • ...Vibrating apparatus operating with systems involving rotary unbalanced masses (E02D 3/054 takes precedence) [3] HB CC 2D043
  • E02D3/08
  • ..by inserting stones or lost bodies, e.g. compaction piles (sand drains for soil compaction E02D 3/10; stressing soil while forming foundations E02D 27/28) HB CC 2D043
  • E02D3/10
  • ..by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains (E02D 3/11 takes precedence; soil-penetrating vibrators with auxiliary watering E02D 3/054; drainage of soil in general E02B 11/00) [3] HB CC 2D043
  • E02D3/10,101
  • ...by drain pipes HB CC 2D043
  • E02D3/10,102
  • ...by well points HB CC 2D043
  • E02D3/10,103
  • ...by draining materials such as paper or rope HB CC 2D043
  • E02D3/10,104
  • ...by sand drains HB CC 2D043
  • E02D3/10,105
  • ...by permeating pressures HB CC 2D043
  • E02D3/11
  • .by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14) [3] HB CC 2D043
  • E02D3/115
  • ..by freezing [3] HB CC 2D043
  • E02D3/12
  • .Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D 5/46; soil-conditioning or soil-stabilising materials C09K 17/00) HB CC 2D040
  • E02D3/12,101
  • ..by injection HB CC 2D040
  • E02D3/12,102
  • ..by mixing or agitating HB CC 2D040
  • E02D3/12,103
  • ..by sprinkling HB CC 2D040
    TOP