ReturnTo Theme-Group-Choice | Onelevelup |
(Not Translated)
5G352 | ELECTRIC CABLE INSTALLATION | |
H02G1/00 -1/10 |
H02G1/00-1/02 | AA | AA00 WIRE EXTENSION METHODS AND DEVICES |
AA01 | AA02 | AA03 | AA04 | AA05 | AA06 | AA07 | AA08 | AA09 | AA10 |
. Tip pull methods and devices (including airplane) | . Wire extension methods to hang to messenger wire | . Wire extension methods to accompany with messenger wire | . Rushing to overhead wire | . Wire extension yokes and counter weights | . Joint protectors and clamp protectors | . Come alongs and split wire | . Rope for wire extension, traction metal fittings, and joints | . Sending out methods and devices (including wire extension vehicles) | . Winding methods and devices (including winches) | |||
AA11 | AA12 | AA13 | AA14 | AA15 | ||||||||
. Controls of wire extension | . Slackness | . Overhead wire passing through steel tower, electric pole, and metal wheel | . Replacing the overhead wire | . Others | ||||||||
AB | AB00 TOOLS AND WORK ARTICLES |
AB01 | AB02 | AB03 | AB04 | AB05 | AB06 | AB07 | AB08 | AB09 | ||
. Tools and work articles for electric pole | . Up and down devices and hanging-up devices | . Removal and collection of metal fittings and tools | . Scaffolds, work benches, and ladders | . Falling object receiving tools | . Electric wire cutters | . Installation tools (electric wire compressors and others) for overhead wire | . Suspended machines | . Others | ||||
AC | AC00 INSTALLATION AND REMOVAL OF ATTACHMENTS TO/FROM THE SUPPORTING OBJECT OR OVERHEAD WIRE |
AC01 | AC02 | AC03 | AC04 | |||||||
. Installation and removal to/from electric pole and steel tower | . Installation and removal to/from overhead wire | . Installation and removal of insulation covers | Others | |||||||||
AD | AD00 CONSTRUCTION WORKS OF STEEL TOWER, ELECTRIC POLE AND PORCELAIN INSULATOR |
AD01 | AD02 | AD03 | AD04 | |||||||
. New construction, and pole election | . Replacing construction | . Porcelain insulators installation works | . Others | |||||||||
AE | AE00 LIVE WIRE WORKS AND WORK ARTICLES |
AE01 | AE02 | AE03 | AE04 | AE05 | AE06 | AE07 | AE08 | AE09 | AE10 | |
. Grounding at the time of interruption of electric service | . Marks (prevention of danger and boundary marks) | . Prevention of electric shock by the conductors, and prevention of electric shock by the insulators | . Tools for live wire works (including sheath removal tools and abrasion tools) | . . Long tools for live wire works such as hot stick and the like | . . Tools for bind wire winding | . Live wire works while keeping the electricity by bypass wire | . . Bypass work articles | . . . Bypass switches | . Scaffolds and ladders for live wire work | |||
AE11 | ||||||||||||
. Others | ||||||||||||
AF | AF00 METAL WHEELS |
AF01 | AF02 | AF03 | AF04 | AF05 | AF06 | AF07 | AF08 | AF09 | AF10 | |
. Fixed metal wheels | . . Installation of metal wheel | . . Overhead wire joints, and protection of the joint protector | . Doors of the frame | . Up and down of metal wheel and its operation from the ground | . Brakes and stoppers | . Measurement, monitoring and control (example, the tension) | . Cabling | . Grounding (grounding of the overhead wire) | . Structures, and the like of pulley, roller and caterpillar | |||
AF11 | ||||||||||||
. Others | ||||||||||||
AG | AG00 MOVABLE METAL WHEELS |
AG01 | AG02 | AG03 | AG04 | AG05 | AG06 | AG07 | AG08 | AG09 | AG10 | |
. Movable metal wheels arranged to the overhead wire in parallel | . Movable metal wheels arranged in double cross like, in box like or in annular like | . Characteristics for top and bottom inversion | . Non-inversion metal wheels | . Arrangement in parallel, in zigzag, in U-shape and in V-shape | . Movable metal wheels having the impeller between top and bottom metal wheels | . Self-run metal wheels | . Movable metal wheels which can cross over the overhead wire accessories | . Open and close of the frame when crossing the obstacles | . Collection of metal wheel | |||
AG11 | AG12 | |||||||||||
. Caterpillars and crawlers | . Others | |||||||||||
AH | AH00 SELF-RUN MACHINES |
AH01 | AH02 | AH03 | AH04 | AH05 | AH06 | AH07 | AH08 | AH09 | ||
. Self-run machines for rushing | . Self-run machines for maintenance check | . Self-run machines with camera | . Self-run machines that worker gets on | . Self-run machines for wire extension | . Power and drive of self-run machine | . Crossing the obstacle | . Self-run machines for installing accessories of overhead wire | . Others | ||||
AJ | AJ00 HIGH PLACE WORKING VEHICLES FOR OVERHEAD WIRE |
AJ01 | AJ02 | AJ03 | AJ04 | AJ05 | AJ06 | AJ07 | AJ08 | AJ09 | AJ10 | |
. Buckets | . Power supply and wiring | . Booms | . Mooring and prevention of fall down | . Pole erecting vehicles | . Overhead wire temporary supporting vehicles | . Wire extension vehicles | . Installation of protective tubes | . High place working vehicles with manipulator | . High place working vehicles with camera | |||
AJ11 | ||||||||||||
. Others | ||||||||||||
AK | AK00 MAINTENANCE AND WORKS FOR PREVENTION OF SNOW STUCK, AND SNOW REMOVING |
AK01 | AK02 | AK03 | AK04 | AK05 | ||||||
. Prevention of snow stuck | . . Installation and removal of snow stuck prevention rings | . Monitoring of snow stuck | . The snow removal (including snow melting) | . Others | ||||||||
AL | AL00 CONSTRUCTION METHODS, DEVICES AND MAINTENANCE FOR THE SPECIFIC OVERHEAD WIRE |
AL01 | AL02 | AL03 | AL04 | AL05 | AL06 | |||||
. Construction methods, devices and maintenance for OPGW, and overhead and grounding wires. | . Construction methods, devices and maintenance of ACSR | . Slackness suppression | . Construction methods, devices and maintenance of multiple conductors | . Construction methods, devices and maintenance of the optical cable | . Others | |||||||
AM | AM00 MAINTENANCE AND REPAIR |
AM01 | AM02 | AM03 | AM04 | AM05 | AM06 | |||||
. Measurement (including gauges and rulers) | . Detection, warning, monitoring and washing, cleaning | . Coating (example, oil) | . Repair | . Methods of maintenance and check (including the kite collecting machines) | . Others | |||||||
H02G1/04 | BA | BA00 FOR INSTALLATION OR TENSIONING |
BA01 | BA02 | BA03 | BA04 | ||||||
. Wire tensioners | . Wire grippers | . Wire tensioning methods | . Others | |||||||||
H02G1/06 | CA | CA00 FOR CABLE INSTALLATION |
CA01 | CA02 | CA03 | CA04 | CA05 | CA06 | CA07 | CA08 | CA09 | CA10 |
. Incline | . Vertical | . Snake (meandered installation) | . Burying | . Apparatus for cable installation | . Auto mobile installation vehicles | . Installation in the indoor building | . Examination and inspection | . Cable removal | . Others | |||
CB | CB00 CABLE EXTENSION METHODS |
CB01 | CB02 | CB03 | CB04 | CB05 | CB06 | CB07 | CB08 | CB09 | CB10 | |
. Methods of the tip pulling | . Methods to hang down on the rail | . Methods to hang down on the wire | . Methods to place on the roller or on the mount | . Methods to accompany with messenger wire | . Methods using endless wire | . Methods using buoyancy of the water | . Deliver and rewind methods | . Methods of wire storing | . Wire extension methods for the curved portion | |||
CB11 | CB12 | CB13 | ||||||||||
. Wire extension methods of multiple wires cable | . Protection of the cable when wire tensioning | . Others | ||||||||||
CC | CC00 MEASUREMENTS AND CONTROLS WHEN THE CABLE WIRE TENSIONING |
CC01 | CC02 | CC03 | CC04 | CC05 | CC06 | |||||
. Measurements and controls of slack volume | . Measurements and controls of tensile strength | . Measurements and controls of wire extension speed | . Measurements and controls of the friction force and the cable pressing power | . Measurements and controls of multiple elements | . Others | |||||||
CD | CD00 INSTALLATION OF SPECIAL CABLES |
CD01 | CD02 | CD03 | CD04 | CD05 | CD06 | CD07 | CD08 | CD09 | CD10 | |
. Installation of OF cable | . Installation of the gas insulation cable | . Installation of the cable in the duct line atmosphere | . Installation of the pipe type cable | . Installation of the aluminum sheathed cable | . Installation of the heating cable | . Installation of the inductive radio cable | . Installation of the water cooled cable | . Installation of the bus duct and the trolley line | . Installation of the optical cable | |||
CD11 | ||||||||||||
. Others | ||||||||||||
CE | CE00 SPECIAL INSTALLATION OF CABLE |
CE01 | CE02 | CE03 | CE04 | CE05 | ||||||
. Fireproof and heat-resistant installation of cable | . Cable installation into rack, tray, and receiving shelf | . Cable installation to bridge, and the like | . Twist installation | . Others | ||||||||
CF | CF00 CABLE INSTALLATION INTO SERVICE WAY (TUNNEL) |
CF01 | CF02 | CF03 | CF04 | CF05 | CF06 | CF07 | CF08 | CF09 | ||
. Service way digging | . Concrete working | . Cable installation to shelf of service way wall | . Carriages and scaffolds for installation in the service way | . Introduction and wire extension of cable in the service way | . Cable fixing in the service way | . Import and export of apparatuses into/from the service way | . Cable installation into sewerage way | . Others | ||||
CG | CG00 CABLE INSTALLATION INTO THE DUCT LINE (INCLUDING THE TROUGH) |
CG01 | CG02 | CG03 | CG04 | CG05 | CG06 | |||||
. Construction of duct line (including the connection of pipes and the bell mouse) | . Manhole | . Trough (including perforation) | . Cable fixing | . Pipe repair and correction | . Others | |||||||
CH | CH00 CABLE INSTALLATION IN GENERAL |
CH01 | CH02 | CH03 | CH04 | CH05 | CH06 | CH07 | CH08 | |||
. Display such as core line, sheath and the like | . Identification of the core line for connection | . Cable bundling | . Cable transportation | . Installation using the robot | . Cleaning and washing | . Repair and temporary restoration | . Others | |||||
CJ | CJ00 CABLE RETRACTING DEVICES AND CABLE EXTENSION DEVICES |
CJ01 | CJ02 | CJ03 | CJ04 | |||||||
. By the turn of the roller (include caterpillar type) | . By the back and forth movements of the clamp | . Characteristics of the supporting shelves. | . Others | |||||||||
CK | CK00 TOOLS AND WORKING ARTICLES |
CK01 | CK02 | CK03 | CK04 | CK05 | CK06 | CK07 | CK08 | |||
. Up and down devices | . Work benches, scaffolds and covers | . Cutters | . Twist correcting tools | . Electric wire pulling tools and electric wire guiding tools | . Stress removers and venders | . Wire insertion tools | . Others | |||||
CL | CL00 ROLLERS FOR INSTALLATION |
CL01 | CL02 | CL03 | ||||||||
. Characteristics in the shape of the roller | . Characteristics for arrangement of rollers (horizontal, diagonal and the like) | . Others | ||||||||||
H02G1/08-1/08,080 | DA | DA00 PASS THROUGH IN THE TUBE OR THE CONDUIT |
DA01 | DA02 | DA03 | DA04 | DA05 | DA06 | DA07 | DA08 | DA09 | |
. Wire pass through using the air pressure | . Self-run machines with electricity or the drive source | . Cleaning | . Guides for wire guiding | . Wire pass through machines | . Leading-in end parts | . Lubrication | . Examination, inspection and monitoring | . Others | ||||
H02G1/10 | EA | EA00 IN WATER OR UNDERWATER |
EA01 | EA02 | EA03 | EA04 | EA05 | EA06 | EA07 | |||
. Methods and devices | . Cable guiding | . Cable withdrawal | . Brakes | . Examination, inspection and monitoring | . Burying machines | . Others |