F-Term-List

5G017 Gas-insulated switchgears
H02B13/00 -13/08
H02B13/00-13/08 AA AA00
SPECIFIC TYPES OF GAS-INSULATED SWITCHGEARS (GIS)
AA01 AA02 AA03 AA04 AA05 AA06 AA07
. Pipe-route main bus-bar gas-insulated switchgears (GIS) . . Multiple bus bars . . . Vertical arrangements of multiple bus bars . . . Parallel arrangements of multiple bus bars . . Vertical breakers . . Connection to cables . . Connection to suspended (i.e., aerial) lines
AA11 AA12 AA13 AA14 AA15
. Bushings (i.e., aerial bus bars) . . Vertical breakers . . Non-vertical bushing . . Bushings for operation units . . Bushings for connections with outside equipment
AA21 AA22 AA23 AA24 AA25 AA26 AA27
. All-in-one gas-insulated switchgears (i.e., box casings) . . Housings or casings . . Internal structures . . Operation units . . Connection to outside equipment . . Division into multiple units for maintenance . . Structures of multiple circuits
AA31 AA32 AA33
. Switch-boxes for alternating current and direct current . Receiving substation . Others
BB BB00
GAS-INSULATED SWITCHGEAR STRUCTURAL UNITS
BB01 BB02 BB03 BB04 BB05 BB06 BB07 BB08 BB09 BB10
. Breakers . Disconnectors . Ground devices . . Operation units . . Structures that allow examination of the insulation . . Prevention of current rush (i.e., resistance-rounding) . . Electric field relaxation (i.e., shielding) . . Grounding confirmation . Discharge gaps and lightning arrestors . Lead bushings
BB11 BB12 BB13 BB14 BB15 BB16 BB17 BB18 BB19 BB20
. Current transformers for meters . . Arrangements . . Structures . Transformer gauges for meters . . Arrangements . . Structures . Potential dividers for condensers, and detection electrodes . . Arrangements . . Structures . Bus bars
BB21
. Others
CC CC00
GROUNDING OF TANKS
CC01 CC02 CC03
. Measures to prevent induction surges . Measures to prevent a closed-circuit induction current . Others
DD DD00
GASES
DD01 DD02 DD03 DD04 DD05 DD06 DD07 DD08 DD09 DD10
. Composition and pressure . Measures to prevent impurities in gases . . Adsorption agents . . Measures to prevent the introduction of metal powder . . . Traps . Gas circulation . . Gas collection . . Gas filling . . Cooling with gases . . Gas heating
DD11 DD12 DD13 DD14
. . Gas purification . Monitoring of the gas pressure . Protection related to gas pressure . Others
EE EE00
MONITORING, INSPECTION, AND EXAMINATION OF GAS-INSULATED SWITCHGEAR (GIS) MALFUNCTIONS
EE01 EE02 EE03 EE04 EE05 EE06 EE07
. Monitoring . . Monitoring of grounding and short circuits . . . Detection by non-electric parameters (e.g., light or sound) . . Monitoring of temperature . Visual inspection . Examination . Others
FF FF00
CONNECTION UNITS
FF01 FF02 FF03 FF04 FF05 FF06 FF07 FF08 FF09 FF10
. Connections between structural elements of or connections within gas-insulated switchgears (GIS) . . Connection of conductors . . Connection of sheathing (i.e., flange-connection units) . . . Measures to prevent current in the sheathing . . . Expansion joints . . Structures of insulating spacers . . . Central conductor support structures . . . Flange-unit structures . Connections of gas-insulated switchgears (GIS) to bushings . Connections of gas-insulates switchgears (GIS) to cables
FF11 FF12
. Connections of gas-insulated switchgears (GIS) to oil-injection apparatuses . Others
GG GG00
MANUFACTURE, ASSEMBLY, AND MOUNTING
GG01 GG02 GG03
. Manufacture and assembly . Mounting . Others
HH HH00
OTHERS (I.E., ARTICLES NOT ASSIGNED ABOVE)
HH01 HH02 HH03 HH04 HH05 HH06
. Casings and housings . Operation units . Conductors . Insulation . Cooling . Others
JJ JJ00
SPECIFIC PHASE AND CIRCUIT STRUCTURES
JJ01 JJ02 JJ03 JJ04
. Three-phase batch circuits . Separated phase circuits . Mixture of three-phase batch circuits and separate-phase circuits . Batch-storage units for multiple circuits