FI-MainGroup/Facet-Choice

  • E02F,ESW
  • Applicable area: "1/00-9/28" Support systems of construction works, e.g. designing, execution, management [other than control]
  • E02F,ETD
  • Applicable area: "1/00-9/28" Characterized by installing solar cells to civil engineering structures, buildings or ground
  • E02F1/00
  • General working methods with dredgers or soil-shifting machines (methods for making embankments E02D 17/18; methods for mining E21C) HB CC 2D011
  • E02F3/00
  • Dredgers; Soil-shifting machines (for special purposes E02F 5/00; other machines or apparatus for mining E21C; tunnelling E21D) HB CC 2D011
  • E02F5/00
  • Dredgers or soil-shifting machines for special purposes HB CC 2D014
  • E02F7/00
  • Equipment for conveying or separating excavated material (barges adapted for carrying-away material from floating dredgers B63B 35/28) HB CC 2D014
  • E02F9/00
  • Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F 3/00-E02F 7/00 (laying-out or take-up devices for trailing electric cables B66C) [3] HB CC 2D015
    TOP