FI (list display)

  • E02F7/00
  • Equipment for conveying or separating excavated material (barges adapted for carrying-away material from floating dredgers B63B 35/28) HB CC 2D014
  • E02F7/00@A
  • Transferring devices using gateposts or towers HB CC 2D014
  • E02F7/00@H
  • .of intermittent type HB CC 2D014
  • E02F7/00@J
  • .of continuous HB CC 2D014
  • E02F7/00@B
  • using of conveyor bridges HB CC 2D014
  • E02F7/00@E
  • using of conveyors HB CC 2D014
  • E02F7/00@L
  • .of belt type HB CC 2D014
  • E02F7/00@M
  • .of bucket type HB CC 2D014
  • E02F7/00@N
  • .Safety, drive, controls HB CC 2D014
  • E02F7/00@F
  • by pipes, boats HB CC 2D014
  • E02F7/00@C
  • Separating devices HB CC 2D014
  • E02F7/00@D
  • Involving improvements of excavated soil HB CC 2D014
  • E02F7/00@Z
  • Others HB CC 2D014
  • E02F7/02
  • .Conveying equipment mounted on a dredger (conveyors in general B65G) HB CC 2D014
  • E02F7/04
  • .Loading devices mounted on a dredger (loading devices in general B65G) HB CC 2D014
  • E02F7/04@A
  • with platforms provided on dredgers per se HB CC 2D014
  • E02F7/04@D
  • .Simple combinations of platform and dredger HB CC 2D014
  • E02F7/04@E
  • .Loading on platform by running HB CC 2D014
  • E02F7/04@F
  • .Driving platforms, unloading dredged soil HB CC 2D014
  • E02F7/04@B
  • using of belt conveyors (C takes precedence) HB CC 2D014
  • E02F7/04@C
  • using of screw conveyors HB CC 2D014
  • E02F7/04@Z
  • Others HB CC 2D014
  • E02F7/06
  • .Delivery chutes or screening plants mounted on a dredger (separating equipment in general B03; delivery chutes in general B65G) HB CC 2D014
  • E02F7/10
  • .Pipe-lines for conveying excavated materials (pipes in general F16L; pipe-line systems F17D) HB CC 2D014
  • E02F7/10@A
  • Fitting structures for pipe-lines HB CC 2D014
  • E02F7/10@B
  • Floats used for pipe-lines HB CC 2D014
  • E02F7/10@Z
  • Others HB CC 2D014
    TOP