FI (list display)

  • F16L1/00
  • Laying or reclaiming pipes; Repairing or joining pipes on or under water [2, 5, 6] HB CC 3H038
  • F16L1/00@A
  • Piping to specific members HB CC 3H038
  • F16L1/00@B
  • .Piping to interior of the building HB CC 3H038
  • F16L1/00@C
  • ..Piping vertical direction HB CC 3H038
  • F16L1/00@D
  • ..Piping to ceiling or floors HB CC 3H038
  • F16L1/00@E
  • .Piping to inclining surfaces HB CC 3H038
  • F16L1/00@F
  • .Piping to equipment HB CC 3H038
  • F16L1/00@G
  • .Piping to high places HB CC 3H038
  • F16L1/00@H
  • .Piping to inside the pipe HB CC 3H038
  • F16L1/00@J
  • ..Piping flexible pipe (lining inside the pipe B29C63/00, coating inside the pipe B05C7, B05D7/22) HB CC 3H038
  • F16L1/00@K
  • ...By reversed tube HB CC 3H038
  • F16L1/00@L
  • ..Piping rigid pipes HB CC 3H038
  • F16L1/00@M
  • ...Alleviating piping operation by low friction materials HB CC 3H038
  • F16L1/00@N
  • ....By railing HB CC 3H038
  • F16L1/00@P
  • ...Caulking with fill between new and old pipes HB CC 3H038
  • F16L1/00@Q
  • ...Positioning new pipes to old pipes by applying spacers HB CC 3H038
  • F16L1/00@R
  • ...Piping to the branch members of old pipes HB CC 3H038
  • F16L1/00@S
  • ...Piping to the curved members of old pipes HB CC 3H038
  • F16L1/00@T
  • Regarding replacing a part of piping HB CC 3H038
  • F16L1/00@U
  • Laying out plastic pipes (F16L1/00@J takes precedence, underground piping F16L1/02) HB CC 3H038
  • F16L1/00@V
  • Centre square for connecting pipes, hauling pipes methods, tools HB CC 3H038
  • F16L1/00@W
  • .Centre square for egg shaped pipes HB CC 3H038
  • F16L1/00@X
  • Molding pipes, measuring tools HB CC 3H038
  • F16L1/00@Y
  • Putting identification symbols, e.g. colour, on the pipes HB CC 3H038
  • F16L1/00@Z
  • Others HB CC 3H038
  • F16L1/024
  • .Laying or reclaiming pipes on land, e.g. above the ground(F16L1/12 takes precedence) [5] HB CC 3H038
  • F16L1/026
  • ..in or on a frozen surface [6] HB CC 3H038
  • F16L1/028
  • ..in the ground(F16L1/026 takes precedence) [6] HB CC 3H038
  • F16L1/028@A
  • Connection methods and their equipment ( F16L1/00@V for center squaring and drawing) HB CC 3H038
  • F16L1/028@B
  • .Installing methods for branch pipes HB CC 3H038
  • F16L1/028@C
  • Under water methods and their equipment HB CC 3H038
  • F16L1/028@D
  • Vertical piping methods and their equipment HB CC 3H038
  • F16L1/028@E
  • Propulsion methods HB CC 3H038
  • F16L1/028@F
  • Protective methods for uneven settlement or floating of pipes HB CC 3H038
  • F16L1/028@G
  • .Using pipe sleepers, posts HB CC 3H038
  • F16L1/028@J
  • .Improving filling soil HB CC 3H038
  • F16L1/028@K
  • .Regarding the pipes jutted out of the building HB CC 3H038
  • F16L1/028@L
  • Methodologies including disposal of old pipes and their equipment HB CC 3H038
  • F16L1/028@M
  • .Replacing old pipes that are disposed with new pipes. HB CC 3H038
  • F16L1/028@N
  • .Extracting pipes HB CC 3H038
  • F16L1/028@P
  • .Disposing after filling inside of the pipe HB CC 3H038
  • F16L1/028@Q
  • Laying pipes under ground, e.g. pipe layers HB CC 3H038
  • F16L1/028@R
  • Anti-corrosion processing HB CC 3H038
  • F16L1/028@S
  • Thermal mechanisms, thermal insulation mechanisms HB CC 3H038
  • F16L1/028@T
  • Support for curving members HB CC 3H038
  • F16L1/028@U
  • Box culvert HB CC 3H038
  • F16L1/028@V
  • Indicting under ground pipes HB CC 3H038
  • F16L1/028@Z
  • Others HB CC 3H038
  • F16L1/032
  • ...the pipes being continuous(F16L1/038 takes precedence) [6] HB CC 3H038
  • F16L1/036
  • ...the pipes being composed of sections of short length(F16L1/038 takes precedence) [6] HB CC 3H038
  • F16L1/038
  • ...the pipes being made in situ [6] HB CC 3H038
  • F16L1/06
  • ..Accessories therefor, e.g. anchors [5] HB CC 3H038
  • F16L1/09
  • ...for bringing two tubular members closer to each other [6] HB CC 3H038
  • F16L1/10
  • ...for aligning [5] HB CC 3H038
  • F16L1/11
  • ...for the detection or protection of pipes in the ground [6] HB CC 3H038
  • F16L1/12
  • .Laying or reclaiming pipes on or under water [5] HB CC 3H038
  • F16L1/12@X
  • Laying methodologies and their equipment HB CC 3H038
  • F16L1/12@E
  • .Laying pipes in the sea being stretched from the land HB CC 3H038
  • F16L1/12@F
  • .Laying pipes on or under sea water by pipe-laying vessels HB CC 3H038
  • F16L1/12@H
  • .Laying out cables HB CC 3H038
  • F16L1/12@J
  • .Laying pipes while constructing pipes on the bottom of sea HB CC 3H038
  • F16L1/12@K
  • .Laying pipes led by cables HB CC 3H038
  • F16L1/12@L
  • Pipe protection and fixing. HB CC 3H038
  • F16L1/12@N
  • Sealing means of pipe terminals HB CC 3H038
  • F16L1/12@T
  • Hauling pipes into the building under water HB CC 3H038
  • F16L1/12@U
  • Hoisting pipes up HB CC 3H038
  • F16L1/12@V
  • Monitoring the laying points HB CC 3H038
  • F16L1/12@W
  • Coating pipes on the pipe-laying vessels HB CC 3H038
  • F16L1/12@Z
  • Others HB CC 3H038
  • F16L1/14
  • ..between the surface and the bottom [5] HB CC 3H038
  • F16L1/15
  • ...vertically [6] HB CC 3H038
  • F16L1/16
  • ..on the bottom [5] HB CC 3H038
  • F16L1/18
  • ...the pipes being S- or J-shaped and under tension during laying [5] HB CC 3H038
  • F16L1/19
  • ....the pipes being J-shaped [6] HB CC 3H038
  • F16L1/20
  • ..Accessories therefor, e.g. floats or weights [5] HB CC 3H038
  • F16L1/225
  • ...Stingers [6] HB CC 3H038
  • F16L1/23
  • ...Pipe tensioning apparatus [6] HB CC 3H038
  • F16L1/235
  • ...Apparatus for controlling the pipe during laying [6] HB CC 3H038
  • F16L1/24
  • ...Floats; Weights [5] HB CC 3H038
  • F16L1/26
  • .Repairing or joining pipes on or under water [5] HB CC 3H038
    TOP