FI (list display)

  • G01C5/00
  • Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels (G01C 3/20, G01C 3/30take precedence) HB CC 2F139
  • G01C5/00@L
  • Using of datum light HB CC 2F139
  • G01C5/00@M
  • .Characterised by light projectors HB CC 2F139
  • G01C5/00@N
  • .Characterised by light receptacle HB CC 2F139
  • G01C5/00@T
  • Using of telescopes HB CC 2F139
  • G01C5/00@Z
  • Others HB CC 2F139
  • G01C5/02
  • .involving automatic stabilisation of the line of sight HB CC 2F139
  • G01C5/04
  • .Hydrostatic levelling, i.e. by flexibly interconnected liquid containers at separated points HB CC 2F139
  • G01C5/04@A
  • Using of electrical means to obtain final indication value HB CC 2F139
  • G01C5/04@Z
  • Others HB CC 2F139
  • G01C5/06
  • .by using barometric means HB CC 2F139
    TOP