FI (list display)

  • F22B21/00
  • Water-tube boilers of vertical or steeply-inclined type i.e. the water-tube sets being arranged vertically or substantially vertically HB CC 3L032
  • F22B21/02
  • . built-up from substantially-straight water tubes HB CC 3L032
  • F22B21/04
  • ..involving a single upper drum and a single lower drum, e.g. the drums being arranged transversely HB CC 3L032
  • F22B21/06
  • ... the water tubes being arranged annularly in sets e.g. in abutting connection with drums of annular shape HB CC 3L032
  • F22B21/06@A
  • the annular arrangement consisting of multiple lines HB CC 3L032
  • F22B21/06@Z
  • Others HB CC 3L032
  • F22B21/08
  • ... the water tubes being arranged sectionally in groups or in banks e.g. bent over at their ends HB CC 3L032
  • F22B21/10
  • ...the water tubes being arranged in staggered rows HB CC 3L032
  • F22B21/12
  • .. involving two or more upper drums and two or more lower drums e.g. with crosswise-arranged water-tube sets in abutting connection with drums HB CC 3L032
  • F22B21/14
  • .. involving a single upper drum and two or more lower drums HB CC 3L032
  • F22B21/16
  • ... the lower drums being interconnected by further water tubes HB CC 3L032
  • F22B21/18
  • .. involving two or more upper drums and a single lower drum HB CC 3L032
  • F22B21/20
  • .. involving sectional or subdivided headers in separate arrangement for each water-tube set HB CC 3L032
  • F22B21/22
  • .built-up from water tubes of form other than straight or substantially straight HB CC 3L032
  • F22B21/24
  • ..bent in serpentine or sinuous form HB CC 3L032
  • F22B21/26
  • ..bent helically, i.e. coiled HB CC 3L032
  • F22B21/28
  • ..bent spirally HB CC 3L032
  • F22B21/30
  • ..bent in U-loop form HB CC 3L032
  • F22B21/32
  • ... disposed horizontally in abutting connection with upright headers or rising water mains HB CC 3L032
  • F22B21/34
  • . built-up from water tubes grouped in panel form surrounding the combustion chamber i.e. radiation boilers HB CC 3L032
  • F22B21/36
  • ..involving an upper drum or headers mounted at the top of the combustion chamber HB CC 3L032
  • F22B21/38
  • .. Component parts thereof e.g. prefabricated panels HB CC 3L032
  • F22B21/40
  • .built-up from water tubes arranged in a comparatively long vertical shaft, i.e. tower boilers HB CC 3L032
    TOP