FI (list display)

  • F16B13/00
  • Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose (nails F16B 15/00; self-locking pins or bolts in general, stud-and-socket releasable fastenings F16B 21/00; dowels or bolts for railroad sleepers E01B 9/00; means for anchoring structural elements or bulkheads specially adapted to foundation engineering E02D 5/74; bolts or dowels used while laying bricks or casting concrete E04B 1/38; setting anchoring bolts in shafts, tunnels or galleries E21D 20/00; anchoring bolts for shafts, tunnels or galleries E21D 21/00) [5] HB CC 3J025
  • F16B13/02
  • .in one piece with protrusions or ridges on the shaft HB CC 3J025
  • F16B13/04
  • .with parts gripping in the hole or behind the reverse side of the wall after inserting from the front (friction-grip releasable fastenings in general F16B 2/00) HB CC 3J025
  • F16B13/04@A
  • Applied to pits or feed-through holes and spread-locked on the back side of walls (synthetic resin 13/14) HB CC 3J025
  • F16B13/04@B
  • .Expanding by screwing bolts HB CC 3J025
  • F16B13/04@C
  • .Expanding by pulling out bolts HB CC 3J025
  • F16B13/04@D
  • ..Forming swelling flanges (expansion caulking) HB CC 3J025
  • F16B13/04@E
  • .Expanding by drawing nut members HB CC 3J025
  • F16B13/04@F
  • ..Forming swelling flanges (expansion caulking) HB CC 3J025
  • F16B13/04@G
  • ...with slits in the expansion sections HB CC 3J025
  • F16B13/04@H
  • Applied to pits or holes with bottoms and spread-locked inside holes (synthetic resin 13/14) HB CC 3J025
  • F16B13/04@Z
  • Others HB CC 3J025
  • F16B13/06
  • ..combined with expanding sleeve HB CC 3J025
  • F16B13/06@A
  • Expanded at shaft cone sections to be pulled HB CC 3J025
  • F16B13/06@B
  • Expanded at nut cone sections to be hoisted HB CC 3J025
  • F16B13/06@C
  • Expanded at both ends of sleeves HB CC 3J025
  • F16B13/06@D
  • Sleeves made from wires HB CC 3J025
  • F16B13/06@Z
  • Others HB CC 3J025
  • F16B13/08
  • ..with separate gripping parts moved into their final position in relation to the body of the device without further manual operation HB CC 3J025
  • F16B13/08@A
  • Expanding inside holes by fastening and pushing bolts at the same time HB CC 3J025
  • F16B13/08@B
  • .with expansion nails HB CC 3J025
  • F16B13/08@C
  • with nails which expand by pulling actions received at the time of fastening HB CC 3J025
  • F16B13/08@D
  • Expanding by way of wedges by pulling actions received at the time of fastening HB CC 3J025
  • F16B13/08@Z
  • Others HB CC 3J025
  • F16B13/10
  • ..with separate gripping parts moved into their final position in relation to the body of the device by a separate operation (F16B 13/06 takes precedence) HB CC 3J025
  • F16B13/10@A
  • for bolt members HB CC 3J025
  • F16B13/10@B
  • .Using wedges HB CC 3J025
  • F16B13/10@C
  • .Using driving sleeves HB CC 3J025
  • F16B13/10@D
  • .Using nails HB CC 3J025
  • F16B13/10@E
  • for nut members HB CC 3J025
  • F16B13/10@F
  • .Using wedges HB CC 3J025
  • F16B13/10@G
  • ..Driving wedges HB CC 3J025
  • F16B13/10@H
  • .Using driving sleeves HB CC 3J025
  • F16B13/10@Z
  • Others HB CC 3J025
  • F16B13/12
  • .Separate metal dowel sleeves fastened by inserting the screw, nail, or the like HB CC 3J025
  • F16B13/12@A
  • Brace block sleeves made from plates HB CC 3J025
  • F16B13/12@Z
  • Others HB CC 3J025
  • F16B13/13
  • ..self-cutting [2] HB CC 3J025
  • F16B13/14
  • .Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor [5] HB CC 3J025
  • F16B13/14@A
  • Made of synthetic resin and applied to pit or feed-through holes HB CC 3J025
  • F16B13/14@B
  • .Expanding by folding HB CC 3J025
  • F16B13/14@C
  • .Twist expansion HB CC 3J025
  • F16B13/14@D
  • .Expanding by nut members HB CC 3J025
  • F16B13/14@E
  • Made of synthetic resin and applied to pit or holes with bottoms HB CC 3J025
  • F16B13/14@F
  • Made of rubber HB CC 3J025
  • F16B13/14@Z
  • Others HB CC 3J025
    TOP