FI (list display)

  • F01K13/00
  • General layout or general methods of operation, of complete steam engine plants HB CC 3G080
  • F01K13/00@A
  • Package type power generation facility HB CC 3G080
  • F01K13/00@S
  • .Transportation or installation (W takes precedence.) HB CC 3G080
  • F01K13/00@W
  • .Transformer layout HB CC 3G080
  • F01K13/00@B
  • General layout of all facilities HB CC 3G080
  • F01K13/00@D
  • Measuring or testing device (measurement, testing in general G 01) HB CC 3G080
  • F01K13/00@E
  • Equipment cooling in general (package type power generation facility A, condenser cooling 9/00 A, F 28 B 9/04, equipment cooling control in general 13/02 E) HB CC 3G080
  • F01K13/00@Z
  • Others HB CC 3G080
  • F01K13/02
  • .Regulating, e.g. stopping or starting HB CC 3G080
  • F01K13/02@A
  • Stop (including load shut-off or abrupt load reduction. C, D, and G take precedence.) HB CC 3G080
  • F01K13/02@B
  • Start (C, D, and G take precedence.) (including the starting schedule operation unit) HB CC 3G080
  • F01K13/02@C
  • Stop and start HB CC 3G080
  • F01K13/02@D
  • Adjustment for variable pressure operation HB CC 3G080
  • F01K13/02@E
  • Equipment cooling control in general HB CC 3G080
  • F01K13/02@F
  • Optimisation control (optimisation control for the equipment having at least two engines G) HB CC 3G080
  • F01K13/02@G
  • Control of the equipment having at least two engines (at least two bleeder turbine control 7/38, 102 E, control of the equipment having at least two engines driven by different fluids 23/00) (including the operation assisting device) HB CC 3G080
  • F01K13/02@Z
  • Others HB CC 3G080
    TOP