FI (list display)

  • E21F15/00
  • Methods or devices for placing filling-up materials in underground workings (dams E21F 17/103) [6] HB CC 2D062
  • E21F15/02
  • .Supporting means, e.g. shuttering, for filling-up materials HB CC 2D062
  • E21F15/04
  • ..Stowing mats; Goaf wire netting; Partition walls HB CC 2D062
  • E21F15/06
  • .Filling-up mechanically HB CC 2D062
  • E21F15/08
  • .Filling-up hydraulically or pneumatically (hydraulic or pneumatic transport devices B65G; pipes, pipe couplings F16L) HB CC 2D062
  • E21F15/10
  • ..Hydraulic or pneumatic filling-up machines HB CC 2D062
    TOP