FI (list display)

  • E04H7/00
  • Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site (tower aspects E04H 12/00; storage aspects, e.g. floating roofs, sealing means, filling or discharging means B65D, B65G, F17B, F17C; foundations E02D 27/38) [2] HB CC 2E140
  • E04H7/02
  • . Containers for fluids or gases; Supports therefor [1, 2, 2006.01] HB CC 2E140
  • E04H7/04
  • ..mainly of metal HB CC 2E140
  • E04H7/06
  • ...with vertical axis HB CC 2E140
  • E04H7/06,301
  • ....characterised by construction of side walls HB CC 2E140
  • E04H7/06,301@A
  • by jack-up technique HB CC 2E140
  • E04H7/06,301@B
  • by helical technique HB CC 2E140
  • E04H7/06,301@C
  • by stacking technique HB CC 2E140
  • E04H7/06,301@Z
  • Others HB CC 2E140
  • E04H7/06,302
  • ....characterised by construction of roofs HB CC 2E140
  • E04H7/06,303
  • ....characterised by construction of bottoms HB CC 2E140
  • E04H7/14
  • ...ball-shaped HB CC 2E140
  • E04H7/16
  • ...with horizontal axis HB CC 2E140
  • E04H7/18
  • ..mainly of concrete, e.g. reinforced concrete, or other stone-like material HB CC 2E140
  • E04H7/18@A
  • characterised by construction of tank bodies HB CC 2E140
  • E04H7/18@B
  • .by panels or blocks HB CC 2E140
  • E04H7/18@C
  • characterised by finishing construction HB CC 2E140
  • E04H7/18@D
  • .for liquid or air tightness HB CC 2E140
  • E04H7/18@Z
  • Others HB CC 2E140
  • E04H7/18,301
  • ...characterised by construction of side walls HB CC 2E140
  • E04H7/18,301@A
  • by inversed winding technique HB CC 2E140
  • E04H7/18,301@B
  • by caisson technique HB CC 2E140
  • E04H7/18,301@Z
  • Others HB CC 2E140
  • E04H7/18,302
  • ...characterised by construction of roofs HB CC 2E140
  • E04H7/18,303
  • ...characterised by construction of bottoms HB CC 2E140
  • E04H7/20
  • ...Prestressed constructions HB CC 2E140
  • E04H7/22
  • .Containers for fluent solids, e.g. silos or bunkers; Supports therefor [2] HB CC 2E140
  • E04H7/24
  • ..Constructions, with or without perforated walls, depending on the use of specified materials HB CC 2E140
  • E04H7/26
  • ...mainly of concrete, e.g. reinforced concrete, or other stone-like material HB CC 2E140
  • E04H7/28
  • ....composed of special building elements HB CC 2E140
  • E04H7/30
  • ...mainly of metal HB CC 2E140
  • E04H7/32
  • ...mainly of wood HB CC 2E140
    TOP