FI (list display)

  • E01B29/00
  • Laying, rebuilding, or taking-up tracks; Tools or machines therefor (E01B 27/00, E01B 31/00 take precedence) HB CC 2D057
  • E01B29/02
  • .Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B 29/04 takes precedence) HB CC 2D057
  • E01B29/04
  • .Lifting or levelling of tracks (lifting devices in general B66F) HB CC 2D057
  • E01B29/05
  • .Transporting, laying, removing, or renewing both rails and sleepers (as assembled units E01B 29/02) HB CC 2D057
  • E01B29/06
  • .Transporting, laying, removing, or renewing sleepers (E01B 29/05 takes precedence; carrying devices B65G 7/12) HB CC 2D057
  • E01B29/09
  • ..under, or from under, installed rails HB CC 2D057
  • E01B29/10
  • ...for inserting or removing sleepers HB CC 2D057
  • E01B29/11
  • ....Removal involving destruction of the sleeper, e.g. the sectioning thereof HB CC 2D057
  • E01B29/13
  • ...for moving sleepers in a direction parallel to the rails, e.g. for spacing or aligning them (E01B 29/10 takes precedence) HB CC 2D057
  • E01B29/14
  • ...for lifting sleepers up to the rails (lifting devices in general B66F) HB CC 2D057
  • E01B29/16
  • .Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track (E01B 29/05 takes precedence; moving or tilting heavy loads in general B65G 7/00) HB CC 2D057
  • E01B29/17
  • ..Lengths of rails assembled into strings, e.g. welded together HB CC 2D057
  • E01B29/20
  • ..Moving rails placed on installed sleepers in the plane of the track HB CC 2D057
  • E01B29/22
  • ..Raising rails from sleepers, e.g. for inserting sole-plates (lifting devices in general B66F) HB CC 2D057
  • E01B29/24
  • .Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means (E01B 29/02, E01B 31/26 take precedence) HB CC 2D057
  • E01B29/26
  • ..the fastening means being spikes (E01B 29/16 takes precedence; hand-held tools for nail or staple driving or extracting B25C) HB CC 2D057
  • E01B29/28
  • ..the fastening means being of screw-and-nut type (portable apparatus for fixing or removing screws or the like B25B); Apparatus therefor, adapted to additionally drilling holes HB CC 2D057
  • E01B29/29
  • ...for horizontally-arranged fastening elements, e.g. fish-bolts HB CC 2D057
  • E01B29/32
  • .Installing or removing track components, not covered by the preceding groups, e.g. sole-plates, rail anchors (E01B 31/26 takes precedence) HB CC 2D057
  • E01B29/40
  • .Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track (temporary fishplates E01B 11/18) HB CC 2D057
  • E01B29/42
  • .Undetachably joining or fastening track components in or on the track, e.g. by welding, by gluing; Pre-assembling track components by gluing; Sealing joints with filling components (E01B 31/26 takes precedence; independent heating means E01B 31/18; welding in general B23K; gluing metal parts in general F16B 11/00) HB CC 2D057
  • E01B29/44
  • ..Methods for effecting joining of rails in the track, e.g. taking account of ambient temperature HB CC 2D057
  • E01B29/46
  • ..Devices for holding, positioning, or urging together the rail ends (adjusting the joint by moving rails E01B 29/20) HB CC 2D057
    TOP