FI (list display)

  • E01B27/00
  • Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers HB CC 2D057
  • E01B27/02
  • .Placing the ballast; Making the ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means HB CC 2D057
  • E01B27/04
  • .Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast (E01B 27/06, E01B 27/12 take precedence; redistributing ballasting material E01B 27/02) HB CC 2D057
  • E01B27/06
  • .Renewing or cleaning the ballast in situ, with or without concurrent work on the track HB CC 2D057
  • E01B27/08
  • ..the track having been taken-up (E01B 27/11 takes precedence) HB CC 2D057
  • E01B27/10
  • ..without taking-up the track (E01B 27/11 takes precedence) HB CC 2D057
  • E01B27/11
  • ..combined with concurrent renewal of track components HB CC 2D057
  • E01B27/12
  • .Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast HB CC 2D057
  • E01B27/13
  • ..Packing sleepers, with or without concurrent work on the track (preforming ballast cores or seats for sleepers E01B 27/02) HB CC 2D057
  • E01B27/14
  • ...Manual tools or hand-held power tools therefor HB CC 2D057
  • E01B27/16
  • ...Machines therefor, e.g. so-called sleeper-tamping machines HB CC 2D057
  • E01B27/17
  • ....combined with means for lifting, levelling, or slewing the track HB CC 2D057
  • E01B27/18
  • ...by introducing additional fresh material under the sleepers, e.g. by the measured-shovel method, by the blowing method HB CC 2D057
  • E01B27/20
  • ..Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators (of trackless ballastway E01B 27/02; for packing sleepers E01B 27/12) HB CC 2D057
    TOP