This page displays all 「FI」 in main group E01B27/00. |
HB:Handbook | ||||
CC:Concordance |
|
Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers | HB | CC | 2D057 | |
|
.Placing the ballast; Making the ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means | HB | CC | 2D057 | |
|
.Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast (E01B 27/06, E01B 27/12 take precedence; redistributing ballasting material E01B 27/02) | HB | CC | 2D057 | |
|
.Renewing or cleaning the ballast in situ, with or without concurrent work on the track | HB | CC | 2D057 | |
|
..the track having been taken-up (E01B 27/11 takes precedence) | HB | CC | 2D057 | |
|
..without taking-up the track (E01B 27/11 takes precedence) | HB | CC | 2D057 | |
|
..combined with concurrent renewal of track components | HB | CC | 2D057 | |
|
.Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast | HB | CC | 2D057 | |
|
..Packing sleepers, with or without concurrent work on the track (preforming ballast cores or seats for sleepers E01B 27/02) | HB | CC | 2D057 | |
|
...Manual tools or hand-held power tools therefor | HB | CC | 2D057 | |
|
...Machines therefor, e.g. so-called sleeper-tamping machines | HB | CC | 2D057 | |
|
....combined with means for lifting, levelling, or slewing the track | HB | CC | 2D057 | |
|
...by introducing additional fresh material under the sleepers, e.g. by the measured-shovel method, by the blowing method | HB | CC | 2D057 | |
|
..Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators (of trackless ballastway E01B 27/02; for packing sleepers E01B 27/12) | HB | CC | 2D057 | |