FI (list display)

  • D01H9/00
  • Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at payingout or take-up stations [1, 2006.01] HB CC 4L056
  • D01H9/02
  • .for removing completed take-up packages and replacing by bobbins, cores, or receptacles at take-up stations; Transferring material between adjacent full and empty take-up elements HB CC 4L056
  • D01H9/02@A
  • Bobbin holding devices HB CC 4L056
  • D01H9/02@C
  • .Holding by force from outside the bobbin HB CC 4L056
  • D01H9/02@Z
  • Others HB CC 4L056
  • D01H9/04
  • ..Doffing arrangements integral with spinning or twisting machines HB CC 4L056
  • D01H9/04@F
  • Installation of empty bobbin in ring spinning frame, pull-out of full bobbin HB CC 4L056
  • D01H9/04@G
  • .For installation of empty bobbin only HB CC 4L056
  • D01H9/04@H
  • .For pulling out full bobbins only HB CC 4L056
  • D01H9/04@B
  • .Mass doffing HB CC 4L056
  • D01H9/04@J
  • .Yarn handling at the time of doffing HB CC 4L056
  • D01H9/04@C
  • Doffing in roving process HB CC 4L056
  • D01H9/04@D
  • Roving bobbin exchanges at spinning position HB CC 4L056
  • D01H9/04@E
  • Doffing in open-end spinning process etc. HB CC 4L056
  • D01H9/04@Z
  • Others HB CC 4L056
  • D01H9/06
  • ...Removing yarn from centrifugal cups on to yarn carriers HB CC 4L056
  • D01H9/08
  • ..Doffing arrangements independent of spinning or twisting machines HB CC 4L056
  • D01H9/10
  • ...Doffing carriages HB CC 4L056
  • D01H9/12
  • ...Manual cop-tube applying apparatus; Stands for cop-tube applying apparatus HB CC 4L056
  • D01H9/14
  • ..for preparing machines for doffing ofyarns [1, 2006.01] HB CC 4L056
  • D01H9/16
  • ..Yarn-severing arrangements HB CC 4L056
  • D01H9/18
  • .for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations (D01H 9/10 takes precedence) HB CC 4L056
  • D01H9/18@A
  • General ( ring spinning process) HB CC 4L056
  • D01H9/18@B
  • .Supply of empty bobbin HB CC 4L056
  • D01H9/18@H
  • ..Of peg method HB CC 4L056
  • D01H9/18@C
  • .Filled bobbin removals HB CC 4L056
  • D01H9/18@J
  • ..Of peg method HB CC 4L056
  • D01H9/18@D
  • .Parallel+F932 processing of empty/full bobbin HB CC 4L056
  • D01H9/18@E
  • Roving process HB CC 4L056
  • D01H9/18@F
  • Open-end spinning process etc. HB CC 4L056
  • D01H9/18@G
  • Conveyance of HB CC 4L056
  • D01H9/18@Z
  • Others HB CC 4L056
    TOP