This page displays all 「FI」 in main group B64D17/00. |
HB:Handbook | ||||
CC:Concordance |
|
Parachutes (non-canopied parachutes B64D 19/00) | HB | CC | 3D140 | |
|
.Canopy arrangement or construction | HB | CC | 3D140 | |
|
..formed with two or more canopies arranged about a common axis | HB | CC | 3D140 | |
|
..formed with two or more canopies arranged in a cluster | HB | CC | 3D140 | |
|
..Secondary or shock-absorbing canopies attached to load line | HB | CC | 3D140 | |
|
..Ribbon construction or the like | HB | CC | 3D140 | |
|
..constructed to provide variable or non-uniform porosity over area of canopy | HB | CC | 3D140 | |
|
..with skirt or air-deflecting panels | HB | CC | 3D140 | |
|
...secured to hem of main canopy | HB | CC | 3D140 | |
|
..Vent arrangement or construction | HB | CC | 3D140 | |
|
...variable in area | HB | CC | 3D140 | |
|
.Load suspension | HB | CC | 3D140 | |
|
..Rigging lines | HB | CC | 3D140 | |
|
...attached to hem of canopy | HB | CC | 3D140 | |
|
...attached to apex of canopy | HB | CC | 3D140 | |
|
..Harnesses [4] | HB | CC | 3D140 | |
|
...Construction of quick-release box | HB | CC | 3D140 | |
|
..adapted to control direction or rate of descent | HB | CC | 3D140 | |
|
..incorporating friction devices or frangible connections to reduce shock loading of canopy | HB | CC | 3D140 | |
|
..Releasable fastening devices between parachute and load or pack | HB | CC | 3D140 | |
|
.Packs | HB | CC | 3D140 | |
|
..rigid | HB | CC | 3D140 | |
|
...forming part of load | HB | CC | 3D140 | |
|
..Closing means | HB | CC | 3D140 | |
|
..with separate pack for extractor of auxiliary parachute | HB | CC | 3D140 | |
|
..formed with separate compartments for main canopy, rigging lines, or auxiliary parachute | HB | CC | 3D140 | |
|
..Opening, e.g. manual | HB | CC | 3D140 | |
|
...automatic | HB | CC | 3D140 | |
|
....responsive to barometric pressure | HB | CC | 3D140 | |
|
....responsive to time-delay mechanism | HB | CC | 3D140 | |
|
....by static line | HB | CC | 3D140 | |
|
.Deployment | HB | CC | 3D140 | |
|
..by extractor parachute | HB | CC | 3D140 | |
|
...attached to hem of main canopy | HB | CC | 3D140 | |
|
...attached to apex of main canopy | HB | CC | 3D140 | |
|
..by springs | HB | CC | 3D140 | |
|
..by explosive or inflatable means (connection of valves to inflatable elastic bodies B60C 29/00) | HB | CC | 3D140 | |
|
..Sequential deployment of a plurality of canopies | HB | CC | 3D140 | |
|
..facilitated by method of folding or packing | HB | CC | 3D140 | |
|
.in association with other load-retarding apparatus | HB | CC | 3D140 | |
|
.in association with aircraft, e.g. for braking thereof | HB | CC | 3D140 | |